This site is operated by a business or businesses owned by Informa PLC and all copyright resides with them. Informa PLC's registered office is 5 Howick Place, London SW1P 1WG. Registered in England and Wales. Number 8860726.
How do developers find the best arrangements to working with utilities across the US who are encountering huge MW requests for batteries in recent years, making processing these large amounts difficult
Procurement targets for energy storage
How policy frameworks and market structures influence utility storage strategies
Technical requirements such as the duration, cycling capabilities, degradation rates, and system reliability standards that matter most
What utilities have learned from early energy storage deployments and how expectations have evolved
Grid regulators MISO, SPP, and PJM will publish incremental accreditation and interconnection process tweaks. That will shift which durations and configurations clear.
How can developers, data center offtakers, grid operators, and regulatory actors, in particular, work together to create a more efficient environment for interconnecting?
Optimising processing of interconnection studies that have long brought delays and uncertainty in the grid interconnection application process
Does the policy landscape require a rethink if one of the byproducts in removing tax credit opportunities for wind and solar developers consequently mean projects are withdrawing their applications to connect to the grid?
Regional Development Strategies: Which developers are most active in specific markets and technology segments? How are established renewable developers adapting for storage, and what new entrants are gaining pipeline traction?
M&A Valuation Trends: What asset types are commanding premium valuations in recent transactions? Which risks are buyers avoiding, and how are sellers positioning portfolios across different maturity stages?
Evolving Financing Structures: How are financing models adapting to different storage technologies and revenue streams? What new risk allocation mechanisms are emerging between developers, investors, and lenders?
Tariff uncertainty: Safeguarding against pricing projections, strategic resource planning for developers, and ensuring supply dependability
Industry Consolidation Impact: How will fewer, better-capitalized developers change permitting dynamics and approval success rates as smaller players lose market access?
Design-to-Construction Compliance: What are the most common gaps between approved designs and field execution that delay final sign-offs from utilities and local authorities?
Phased Interconnection Strategies: How can developers leverage battery storage’s faster interconnection timelines and deploy backup systems while awaiting main facility approvals?