Fire Safety by Design: Engineering Resilient BESS for Grid-Scale Deployment

Time: 5:00 PM - 5:40 PM
Date: 24 March 2026

Synopsis

  • Key fire safety risks in current grid-scale BESS and how developers are mitigating them in design and EPC contracts
  • What insurers, lenders, and offtakers now expect to see on safety, warranties, and testing before backing a project
  • How different chemistries such as sodium-ion and lithium iron phosphate compare on safety performance and investor acceptance
  • Practical steps for operators to limit liability and ensure compliance with evolving codes and insurance requirements

« Back