Fire Safety by Design: Engineering Resilient BESS for Grid-Scale Deployment
Time: 5:00 PM - 5:40 PM
Date: 24 March 2026
Synopsis
- Key fire safety risks in current grid-scale BESS and how developers are mitigating them in design and EPC contracts
- What insurers, lenders, and offtakers now expect to see on safety, warranties, and testing before backing a project
- How different chemistries such as sodium-ion and lithium iron phosphate compare on safety performance and investor acceptance
- Practical steps for operators to limit liability and ensure compliance with evolving codes and insurance requirements
« Back