Day Two - US/Central
Pick two market tables, one per round. Each table is hosted by a grid operator, state regulator or utility, with developers and lenders active in that market, and covers interconnection queues, accreditation, procurement and revenue certainty.
Tables:
- ERCOT
- CAISO and the West
- PJM
- MISO/SPP
- NYISO/ISO-NE
- Southeast utility markets
Data centers, manufacturers, logistics hubs and commercial estates all have very different load profiles, and storage developers need to understand them to win the business. Energy buyers from across sectors will set out what they need from storage.
- What do the load profiles of data centers, manufacturers, fleets and commercial estates look like?
- What are buyers prioritizing: cost, resilience, speed to power or decarbonization?
- How can developers tailor storage offerings to different customers?
With grid connection queues and fees proving a major hurdle for large energy users, many are looking at ways to reduce their dependence on the grid, and storage is a key part of the answer.
- Which behind-the-meter storage use cases are gaining traction?
- Does the commercial case for BTM storage stack up?
- How does storage fit alongside on-site generation and site demand?
- What role will energy parks play?
- Who should attend: large energy users, BTM developers and energy park developers
With grid connections taking years in many markets, data centers are turning to on-site storage to connect sooner under flexible interconnection agreements. A data center developer, a storage developer and a utility will walk through a live project:
- How the flexible interconnection agreement with the utility was structured
- What on-site storage means for connection timelines and costs
- Lessons for other data centers looking to get to power faster
- Who should attend: data center developers, storage developers and utilities exploring flexible interconnection
Fire codes, system design and emergency response requirements have changed significantly over the past two years, and large-scale fire testing has moved from optional to mandatory under NFPA 855 and UL 9540A. This session will set out the testing, spacing, detection and explosion protection rules your next permit application must meet, ahead of the tabletop exercise.
Each table will run a thermal-runaway incident from first alarm, through air quality monitoring, to the community update, applying the code requirements from the previous session. A fire service, the permitting authority and an owner will play their real roles.
Insurers and an owner will share loss data by cause, from fire to hail to equipment failure, and the controls that cut claims and premiums.
With federal credits for new solar winding down and storage keeping its credit into the 2030s, adding batteries to operating and late-stage solar sites is one of the busiest deal types in the market. Owners, a grid planner and a tax advisor will cover surplus interconnection to avoid a new queue position, AC versus DC coupling, hybrid versus co-located models in CAISO and ERCOT, and how to split tax credits and tolling contracts between the solar and the storage. You will leave with a checklist for screening a solar fleet for storage retrofits.
New Texas rules on large loads change how data centers connect in ERCOT. This session will explain where co-located and standalone storage will fit.
Power certainty now decides whether a data center gets financed, and many are bringing their own, using on-site storage and generation either as a bridge until the grid connection arrives or as long-term islanded supply.
- Which structures are bankable, from tolls and capital leases to pass-through costs?
- How are lenders assessing tenant credit across hyperscalers and newer operators?
- How do termination rights and single-tenant concentration affect debt sizing?
- What happens to the battery when the bridge period ends, and can it earn grid revenue if a tenant leaves?
- Who should attend: data center developers, lenders and storage developers pursuing data center offtake
Tolling agreements are now the main route to contracted storage revenue. This session will present the latest benchmarks to test your next offer against:
- Current tolling prices and tenors across US markets
- Performance terms and availability guarantees
- How terms differ by market and duration
- Who should attend: IPP origination teams and offtakers negotiating tolls
One board member asking about a high-profile fire can stop a deal. Investors will share the facts and short answers that close the question.
Storage is now critical utility infrastructure and must meet utility-grade security standards. New executive orders and offtaker contracts will set tighter rules on remote access and foreign-made controls, and the panel will explain what owners must change in procurement and operations.
Utilities and states are starting to buy 8-hour-plus and multi-day storage. This session will map the contracted and procured long duration pipeline by technology and state, and show which procurement routes are turning targets into signed contracts.
Long duration storage will only scale if someone signs for it. A utility resource planner, a state procurement agency and two developers will explain how utility IRPs, state programs such as California's central procurement of long duration resources, and capacity accreditation value longer duration, and what a winning bid needs to show. You will leave knowing which buyers are in the market for 2027 to 2028 and how they evaluate bids.
Hundreds of local moratoriums now block storage across the US, and even the strongest projects can fail without community support. Developers, regulators and community voices will discuss what it takes to win local approval.
- What wins local approval, and what gets projects blocked?
- How can engagement become a genuine partnership rather than a checkbox exercise?
- How should developers respond when residents confuse storage sites with data centers?
- What role can regulators and fire officials play in building trust?
- Who should attend: development, permitting and community engagement teams
Many developers skip community benefit agreements because no rule requires one. In this hands-on workshop, each table will draft a host community agreement for a sample project, guided by developers and lawyers who have signed them.
- Local ownership and benefit-sharing options
- What communities ask for, and what is realistic to offer
- Delivering on commitments over a project’s lifetime
- Who should attend: developers and community engagement leads who have not yet signed a community benefit agreement
Connector, busbar and cabling faults cause a share of BESS outages. This session will show the design and installation checks to prevent them.
Owners plan augmentation at financial close, but by year 3 the planned products are often gone. Owners, integrators and engineers will compare warranties, performance guarantees, chemistry changes and contract strategy for augmentation, and the risk of new batteries failing to work with existing EMS and plant controllers.
Tolls are now the main route to contracted storage revenue, but the value sits in the detail. A buyer, a seller and a lawyer will go clause by clause through availability guarantees, degradation and capacity maintenance, liquidated damages, dispatch rights and change-in-law protection. Pairs with the tolling benchmarks session in Room 2 earlier in the day.
FERC Order 2023 changed interconnection studies across the RTOs, and the push to fast-track large-load requests is now triggering restudies for projects already in the queue. Developers, grid planners and a permitting specialist will compare queue progress by region, the IRR impact of a 12-month approval slip on a typical utility-scale project, how to manage restudy cost risk, and how to price fragmented state battery safety rules into development budgets. They will also ask whether better-capitalized developers are using permitting advantages to pull ahead. You will leave with a region-by-region view of realistic connection dates for projects entering the queue now.
Small projects in load pockets can cost as much to develop as large rural ones, but the right markets reward them. With New York as the lead example, this panel will explore:
- Which markets reward distributed storage in load pockets?
- How are corporate credit facilities funding distributed solar and storage portfolios?
- What does it take to develop, permit and connect in dense urban areas?
- Is there enough scale to attract institutional capital?
- Who should attend: distributed developers, C&I storage owners and infrastructure credit funds
Family offices and asset allocators, many with roots in Texas energy, are looking at storage as a long-term hold. This panel will explore how they approach the asset class.
- How do family offices assess storage compared with traditional energy investments?
- What return profiles and hold periods are they targeting?
- Do they prefer to own, co-invest or lend?
- What would make storage a bigger part of their portfolios?
- Who should attend: family offices, private wealth investors and developers raising long-term equity
Recent closings have stacked construction, bridge and term loans, letters of credit, preferred equity and tax credit transfers into a single package. A sponsor and lead arranger will walk through:
- How the financing stack came together
- What lenders asked for in diligence
- Lessons for your next deal
- Who should attend: sponsors, arrangers and finance teams preparing for financial close
IPPs report a shortage of EPC, installation and EMS commissioning capacity, and the year-end rush to meet placed-in-service deadlines strains every party. A BESS is often not market ready for months after EPC completion. EPCs, installers and owners will discuss contracting models, market testing and how to keep contractors engaged until the asset earns revenue.
This session will present recycling and second-life costs and revenues for utility-scale fleets, with US capacity data.
IPP consolidation will continue in 2027. Bankers and buyers will explain how storage pipelines and operating assets affect platform value, and how availability records, warranties and augmentation plans move the price in due diligence.
US energy policy now swings with each election, while critical mineral export controls, tariffs and trade tensions reshape where batteries and their materials come from. This closing interview looks beyond market fundamentals at the political and supply chain forces that will decide where capital flows after the 2028 election, and which strategies will hold up when geography, politics and materials collide. The chair will close the summit by re-running the opening poll.
